The news I got today was good "The builders are coming this week" I have a letter from Antonio expalining everything (which I will post later as I have just arrived home). I also travelled down to the very bottom of the site and took photographs and the ground works are completed there. This is a long way down and I was surprised at how far we went. The road you see on the web cam is going to be widened and this process has started. I have a photograph showing how deep the excavation was from the hills to the left of the road and the road and it is about 10ft deep.
The new access road is in use albeit is still a dirt track but I have photos of the trucks using it. I can tell you that there were so many trucks and contruction vehicles operating that it was a regular traffic jam. Horns were blowing and everythging.
The area to the left and before you arrive at of the grupo trampolin building has been started interms of ground works and i have photos of this as well.
They have told me that the fase 1 will be complete by nov/dec 2008 and that the golf course will be open then as well. Although at the beginning it may only be 3/4 holes.
I dont know for sure but I would imagine that as the villas or Apartments are ready they will hand them over so I suppose some folks maybe in before this. I was told that there are going to be 11 apartment buildings ready in fase 1 but was not advised of any order of construction.
I am going to bed now as it is 01.00hrs and I only landed at 11.30 hrs
keep on smiling!!!!
regards
gerardo