Utilities at Terrazas

Expatica - Health
Post reply   Start new thread
New - Old :: Old - New

Pages: 1 |

Terrazas de Torreblanca forum threads
The Comments
08 Feb 2008 12:00 AM by helen wright Star rating. 23 forum posts Send private message

Hello, can anyone tell me if you can register for utilities without the occupation licence? and does anyone have any news on the status of these apartment, I've been adviced to sign the deed next week but worried as I know that we are still awaiting OL. thanks.




Like 0

Spam post or Abuse? Please let us know

09 Feb 2008 11:40 PM by harry32 Star rating in Winslow Buckinghamsh.... 47 forum posts Send private message

Hi

My advice

 

Do not sign anything before you have LO  you will not be able to be connected to any utilities until one is issued



_______________________
Best Regards Andy  


Like 0

Spam post or Abuse? Please let us know

15 Feb 2008 12:42 PM by JNR Star rating. 2 forum posts Send private message

Hi Helen,

My advice would be to sign nothing at the moment.....I have two clients who are in the same position as you, and I have recommended both not to sign.

I have all the documents from Aifos relating to the claim of "Administrative Silence".... they are in Spanish, but if anyone would like a copy please PM me.

Aifos say that according to planning regulations they are allowed to transfer the required square meterage ( to correct the overbuild) of urbanisable land from another plot, and should therefore should be granted the LO......the Town Halls position is that although the movement of urbanisable square meterage is in theory allowed, permission must be obtained beforehand.....not after you have been caught.

I  can't see a quick solution to this one...it could drag on for months...sorry

JNR




Like 0

Spam post or Abuse? Please let us know

18 Feb 2008 1:38 PM by cannylad Star rating. 35 forum posts Send private message

Hi Helen,

I have signed for my apartment in Block 2 in December. The reason behind this was the fear that Aifos may be going out of buisness. Contrary to what people believe, I have had electric connected to my apartment legally. I know that two meetings have been held at the development over the last week. I believe that these meetings were to form a committee and elect a president. I am not sure on the legality of these meetings due to the lack of OL. I have contacted you directly. Please get in touch if I can be of any further help.

           Keith Lowery




This message was last edited by cannylad on 2/26/2008.


Like 0

Spam post or Abuse? Please let us know

Pages: 1 |
Post reply   Start new thread


Previous Threads

Activa Homes - 0 posts
Maybe Good New's - 2 posts
Jet2.: Valencia to Leeds Bradford Summer 2009 - 0 posts
Terreze de torreblanca - 0 posts
Toyota Corolla Verso 2.2 D4D Sport 177cv For Sale - 3 posts
Habitation license for Terrazas de Torreblanca - 16 posts
property info - 1 posts

4 posts were found:


1 |
Our Weekly Email Digest
Name:
Email:


This site uses cookies. By continuing to browse you are agreeing to our use of cookies. More information here. x