24 Apr 2013 10:59 AM:

 

Hi All,

Current situation at El Pinet  at 12th April as presented to the M2 sector AGM on 13th April.  For those who are not aware the developement has been divided into three sectors each having their own AGM. All I can say is that our sector M2 had a excellent meeting well attended. The following update was received via San Jose.

'Present situation at El Pinet as of 12th April, Iberdrola was presented with the favourable certificates from the OCA for the new towers recently completed and the burial of the medium tension lines between the point of distribution, the towers underground lines as well as the definitive plans of the low tension lines along with the assignment for Iberdrola to accept installations.

With this paperwork Iberdrola will map and energize the sector. It is estimated that in one month the lines will have been energized and the certificate from Iberdrola will be ready so that the Partial Reception can be requested and registered at the Town Hall. Once the certificate has been received and the Partial Reception has been requested, electricity could be contracted for the Public Lights, thats to say, lamp posts. The lamp posts that were missing were recently installed.

The street furniture for the developement is currently in storage and will be installed at the moment the Partial Reception is requested to avoid that this is vandalized or deteriorates.

The trees for the pavements have been purchased and will be planted the same week that the Partial Reception is requested. Negotiations are under way with the Town Hall for the possibility that the irrigation system can be switched on and used to water the trees and start the maintenance.

Once the Partial Reception has been approved by the Town Hall, the Certificates of Habitation can be requested and with these in place, the individual contracts for the water and electricity supply can also be requested'

The other thing to mention is that the largest debtors are being chased in both the UK and Spanish courts with some success although in our Sector alone nearly 50,000 euros is still outstanding.


 


This message was last edited by vagabond on 24/04/2013.


This message was last edited by vagabond on 24/04/2013.


This message was last edited by vagabond on 24/04/2013.
Community thread: El Pinet work by Ibderderola

--------------------------------------
25 Mar 2013 2:46 PM:

 

Yes Bill just received. This is certainly good news for all.



Community thread: El Pinet work by Ibderderola

--------------------------------------
28 Feb 2013 9:41 PM:

 

Vivendoo's website is www.vivendoo.com. E.mails info@vivendoo.com. telephone 96 679 24 17.

If  they have your contact information you will always be kept updated. I never have a problem  as our excellent President on M2  always keeps us advised of the latest news. 



Community thread: HI EVERYONE ANY NEWS ON HAB CERTIFICATE

--------------------------------------
28 Feb 2013 8:03 PM:

 

Hi All,

Just back from El Pinet. Work still progressing albeit slowly. Vivendoo have today advised that the next AGM will be held on Saturday 13th April. 

 Speak to your individual President  for further details of times etc as there are 3 separate AGMs one for each area on the same day. Maintenance on all pools is  carried out on a regular basis and all looked in good order.



Community thread: HI EVERYONE ANY NEWS ON HAB CERTIFICATE

--------------------------------------
04 Feb 2013 5:56 PM:

 

Just received following update from Vivendoo via our President:-

' Iberdrola Elche have confirmed that the Company sub contracted to complete the connections has been hired. This Company has been carrying out measurements and tests on the existing electrical lines that run throughout the Sector MR9 and that have never been used. This is a requirement before any of the builders supply cables can be taken down.They need to make sure there are no areas of the lines that have suffered damages since they were installed by the developer . This is also required by Industry who will issue the certificates of installations once all lines have been measured and tested. They have explained that the timeline estimated for this work to be completed(January) has not been met as they have extended the area that they were initially going to test. Initially they were only to test the lines in what they call the first phase(built area) but are now checking the electrical lines in the whole of MR9 Sector, including those areas(second phase) that will not be taken over(recepcionado) by the Town Hall. Approximately 70/80% oh the installations and lines have been checked and measured. They are expecting to complete this month. Once the above has been completed they will start to take down the builder supply '.



Community thread: HI EVERYONE ANY NEWS ON HAB CERTIFICATE

--------------------------------------

Communities vagabond has joined


El Pinet

vagabond' blogs


vagabond's rentals

vagabond's properties for sale


Spain insurance services


This site uses cookies. By continuing to browse you are agreeing to our use of cookies. More information here. x