We had this sort of communication with our agents Atlas international last year all about the town hall adn Masa refused to give any compensation for the wait.
We signed and from meeting others on the site that week 5 - 12 Jan 2008, when visited the site durigng the week while sorting everything out completing with the notary on Friday 11th
Jan 2008 we then collected the Keys although we still have some snags that need doing.
Meeting some of those already in residence and hearing how long they waited we began bthe process of buying in Oct 06 our house was built, we were supposed to complete March 07 - June 07 and all we kept getting was No roads then it altered to no services electric and water, then No hab cert town hall and finally back to no electric or water.
We made a decsion to come anyway although the connections have not been done to them but we were pelasantly surprised that teh Electric is connected to mains so we will get bills already.
The water we thought was connected but it may have still been the builders but we were assured that this will be connected within a week or two after completion.
What does not make sense is how they have not applied for all the hab cerificates over the last year and it seems that they are not even in blocks.
When were at the notary the builder rep was the most miserable man and i was thinking you are actually selling adn completing you should be pleased.
Good Luck keep us all posted
Trisha and Denis from Essex