Dear Weya,
Jo told us that a number of Allied staff were purchasing houses on this development, are you one of them?
We have accepted all the other changes made, however for a Architect to discover during the build phase that their is not enough room in the Bathrooms to cope with 2 baths and 2 bidets as shown on their drawings we find almost unbelievable. We have also in effect currently lost 3 side windows, 2 of which we have accepted
We paid extra for an end terrace because as one example, it also had side windows. We are only seeking to get some of what we paid for.
In addtion we have been consistantly told that NO alterations to the build could be made as the plans as passed were set "In concrete," even though we requested some small additions for which we were prepared to pay, because it made good sense to incorporate these during the build.
This will now be tested as we have now made a formal request to the Town Hall to investigate what is going on.
We made it quite clear to Carol of Allied that the side window in the dining room similar to the one in number 24 which was to have been bought by her, was a MUST as far as we are concerned.
We are prepared to take action as necessary to achieve this, and if you read this Carol, do not make the mistake of underestimating our determination.
Ray
This message was last edited by Ray Apperley on 4/13/2007.