I have just been told by solictor there is a delay for a month due to delay in some documentation BUT if we want to hang onto our date of 22nd May it could still go through that day but builder is just warning all clients of possible delay. They WILL NOT pay any compensation for flights etc as it is not their fault so they reckon. As I am with Ryanair and flights cheap anyway I am keeping the 22nd May open and then if not around the 20th June.
By the way we viewed ours last week (phase 1, block 8 Apt 1D) and it was very nice and it looks as though the finish is much better than La Entrada as you have fitted cupboards above int he kitche also units fitted under the sink in both of the EnSuites. The only thing that could of been better was the kitchen is a little small BUT we do have a utility room on the back with washing machine and boiler and the longe is huge 5.9mtr across the patio door wall and 4.7mtr across in addition to that it has another square to make the L shape which is 2mtr sq so like I say it is massive. The main bedroom also is a huge 4.7 x 3.1mtr with 2nd bedroom still nice size of 2.8 x 3.4mtr. One other disappointment is at the end of the patio they have put a area same depth as patio and about 1.5mt as a flower bed it would have been better to just make the patio bigger.
But all in all we are very very pleased with what we saw and just want to get in it now.
Don't know what people are doing about furniture but I am importing mine from UK getting a good deal on furniture from local supplier where I live and costing me about £850 to ship it over that is room to room with insurance. Anybody interested in knowing more about this then drop me a pm and I will pass it on.
Regards
Ray