Hi,
I must say I'm really impressed with the amount of work that has been done on the swiming pool area.
The workers have just finished concreting the large pool and hopefully it's going to have some sort of waterproof membrane and then be tiled. It looks about 1 metre deep at the shallow end sloping to 2 metres at the deep end. The guys have been working from 8am right through to 7pm which is impressive.
I will upload lots of photos when I get back home on Saturday as the internet connection here is too slow.
Fingers crossed it should be ready for the summer.