04 Jan 2007 8:43 PM by nick.linda Star rating. 57 forum posts Send private message

Hi Alan, we have just had a look at the table, included in our contract, that gives you the size of rooms and terraces etc. In the section on "zonas comunes" the size ranges from 11.67 metres squared to 17.05 metres squared depending on which apartment it is. As the average size of everyone's lounge/dining room is around 15 square metres, we cannot understand which communal area the "zonas comunes" refers to, as it would not cover a great area, if you can fit it into the lounge.  Is it referring to the corridors inside or the roof area?  It surely cannot include both.


Like 0

Spam post or Abuse? Please let us know

04 Jan 2007 10:40 PM by xetog Star rating in Wiltshire/holiday ap.... 514 forum posts Send private message

I have a set of reasonable plans for Block 1 the apartments facing the road (looking at the sports field) are:

Ground floor: F,E,D & H

Intermediate floors: G,F,E & D

Top floor: F,E & D

Those facing the farm at the back are:

Ground floor; A,B,C & G

Intermediate floors: A, B, C & H

Top Floor: A,B,C & G

The "zonas comunes" are:

Type A: 18.16m2

Type B: 18.16m2

Type C: 18.73m2

Type D: 16.81m2

Typr E: 16.89m2

Type F: 19.68m2

Type G: 18.91m2

Type H: 17.50m2

All of which work out at roughly 28% to 30% of the Trastero Vinculado.

Hope this helps someone.  Our lawyer rang today to say that the builders say block 1 will be ready Feb-March.  Judging by the last pictures, I still take that with a little pinch of salt!

 

Gloria & Mike



Like 0

Spam post or Abuse? Please let us know

04 Jan 2007 10:52 PM by alb Star rating. 182 forum posts Send private message

Hi Nick&Linda

That seems to ring a bell ?  Hope you are well,  Yes you are right i have just worked out that the total roof space of the 3 blocks  is about 1500 sqm  and the total corridor floor space of the 3 blocks is about 700 sqm in total  2200sqm  \ by 72 apartments = 30 sqm  thats even better.

Alan



Like 0

Spam post or Abuse? Please let us know

05 Jan 2007 8:01 PM by nick.linda Star rating. 57 forum posts Send private message

Hi Alan, just noticed the nice photos you have uploaded. Patpur will be interested in photo 6, as it shows the beginnings of the foundations of Brisas del Mar, because Pat posted a request the other week for photos of Brisas. 



Like 0

Spam post or Abuse? Please let us know

06 Jan 2007 11:47 AM by patpur Star rating in Castle Bromwich Bir.... 389 forum posts Send private message

Hi Nick.Linda  and Alan l have sent in the details for the Brtsas Del Mar apartments so hopefully Justin can get a forum up and running soon, then you can up load the photos. l have been watching the development of the Mar y Sol apartments as they are next to the Brisas Del Mar and are being built by the same builder.Regards Pat.


Like 0

Spam post or Abuse? Please let us know

06 Jan 2007 12:40 PM by alb Star rating. 182 forum posts Send private message

Hi Pat

I have uploaded a few more photos,  there is one of the foundations of Brisa del mar 1.

Alan



Like 0

Spam post or Abuse? Please let us know

06 Jan 2007 3:31 PM by patpur Star rating in Castle Bromwich Bir.... 389 forum posts Send private message

Hi Alan thanks its nice to see its started lknow Nick and Linda have some photos also the Brisas del Mar forum should be running soon.l will be out there in march so l can see how it has progressed from the photos. The Mar y Sol should look impressive then Regards Pat.


Like 0

Spam post or Abuse? Please let us know

06 Jan 2007 11:33 PM by nick.linda Star rating. 57 forum posts Send private message

Hi everyone

We were looking through the photos we took  in October and we thought you might be interested to see the ones we took of the interior of our apartment, so you will find them in the photo gallery.  Obviously a long way from finished , but gives you an idea of how they are coming along and going to look.  Photo 1 - kitchen minus granite worktops etc., photo 2 - lounge/dining room, photo 3 - front door and  double lounge doors, photo 4 -  second bathroom/shower room



Like 0

Spam post or Abuse? Please let us know

05 Mar 2007 10:03 PM by alb Star rating. 182 forum posts Send private message

Hi

 Uploaded  new photos of block 4 &5,   also a few of 3 bed apartment.

Alan



Like 0

Spam post or Abuse? Please let us know

06 Mar 2007 9:01 AM by josephotoole Star rating. 45 forum posts Send private message

Hi Alan

From what you seen how far away from completion do you think we are?

Thanks

Joe



Like 0

Spam post or Abuse? Please let us know

06 Mar 2007 6:38 PM by alb Star rating. 182 forum posts Send private message

Hi Joe

Our 3 bed apartments are a couple of weeks behind the rest in the block, like i said before it is up to the individual if they want to complete before the builder gets the hab licence,     what i can't  understand is if the builder was serious about geting these apartments handed over,  why have they not sorted out the garage entrance as you can see on the photos , so that the owners have somewhere to park whilst the contractors are on this side of the site?

Alan



Like 0

Spam post or Abuse? Please let us know

06 Mar 2007 6:38 PM by alb Star rating. 182 forum posts Send private message

Hi Joe

Our 3 bed apartments are a couple of weeks behind the rest in the block, like i said before it is up to the individual if they want to complete before the builder gets the hab licence,     what i can't  understand is if the builder was serious about geting these apartments handed over,  why have they not sorted out the garage entrance as you can see on the photos , so that the owners have somewhere to park whilst the contractors are on this side of the site?

Alan



Like 0

Spam post or Abuse? Please let us know

07 Mar 2007 9:34 AM by josephotoole Star rating. 45 forum posts Send private message

Thanks Alan

So just to confirm you have not transferred remaining funds yet? You will do this when complete, right?

thanks

Joe

 



Like 0

Spam post or Abuse? Please let us know

07 Mar 2007 5:52 PM by alb Star rating. 182 forum posts Send private message

Hi Joe

  Yes when i am satisfied that  everything is 100% finished including the garage.

  Alan



Like 0

Spam post or Abuse? Please let us know

Pages: Previous | 1 | 2 |
Post reply   Start new thread


Previous Threads

Justin, I want an EOS T-Shirt! Do other members? - 1 posts
Finally a Urban Plan is submited for aproval by Marbella Town Hall - 0 posts
Is there anybody out there? - 0 posts
Private Message - 1 posts
Completing on new property when developer has gone bankrupt - 8 posts
completion - 6 posts
snagging - 2 posts
spanish bank accounts - 0 posts
Community Charges - 0 posts
The Cod Father,El Faro,CDS. - 3 posts
Where's Tinasolero ? - 3 posts
New Ryanair routes - 1 posts
Flying to Gib with Gib Air - 1 posts
!!How much is property in Spain and can a us citizen buy some!! - 0 posts