Hi All,
Few more pics taken last week attached.
P1 is Phase 2 at night (from Block 25 looking down towards the pool) showing that lights and seats have now been fitted.
P2 is the Phase 2 water feature under construction (but nearly complete).
P3 shows furniture going into block 43, this seems ahead of blocks 37 to 41.
P4 is the current state of the Spa pool.
P5 shows the back of Blocks 39 to 43.
P6 shows Block 38 on the left and Block 39 on the right.
All the best
David
This message was last edited by DMBRIDGE on 9/29/2007.