14 May 2009 12:00 AM by kennylynn Star rating. 136 forum posts Send private message

Hi All just a brief summary from the meeting Dave  and I had last night

Priensur are aware of 98% of the problems but the 2 which they are doing as priority are the pools and the noise from the pump rooms.There should be a guy coming very soon to repair the pumps and drains from the pools.We were told that he is working on another site very close to us and we are next on the list.

With regards to the noise we are told by the architect that the water is being pumped and the pressure is far to high,but once we are switched to the Manilva supply the pressure will be reduced and reduce the noise.We will have to see but they are well aware there is a problem.

Dave And I spent over 2 hrs last night going around the site and Dave will put a more informative email on the forum  as soon as poss.

Ken

Forgot to mention the other big problem with the smelly area around block 5 steps .This we are told is a blocked drain and that a specialist contractor is going to put a camera down to find the blockage and then clear it.This is one of the priority jobs.When that is sorted it will stop the mud going into the childrens pool in that area.Thats all for now
 

Ken



This message was last edited by kennylynn on 15/05/2009.


Like 0

Spam post or Abuse? Please let us know

14 May 2009 6:24 PM by Pdrich1 Star rating. 261 forum posts Send private message

The people who have taken over from Gerens e-mailed me today about my problem with the balcony.  At least they are showing an interest.  I never received any replies from Gerens.




Like 0

Spam post or Abuse? Please let us know

15 May 2009 9:08 AM by laurdan Star rating. 441 forum posts Send private message

Thanks Ken and Dave for keeping us informed...appreciated




Like 0

Spam post or Abuse? Please let us know

15 May 2009 5:42 PM by Fossie Star rating in Somerset/ Duquesa. 123 forum posts Send private message

Hi Everyone -  to follow on from Ken's summary of our meeting last Wednesday 13th here is the full report:

Attending the meeting were Juan Santos (Administrator), Juan Antonio (now working for the new maintenance company), Alfonso (Head of site maintenance), Mari Paz (architect), Pepe from Block 6, Juan from Block 12 and Ken and myself from Block 7.  Juan Santos' wife, Mony, was also there to make sense of the rapidly spoken Spanish for Ken and I and to help us put across our views.

As Ken mentioned we spent 2 hours walking  the occupied areas of the development  identifying and discussing defects which need to be rectified. These were as follows:

Painters have already been working on doors in the stairwells. They will then go on to paint railings, gates and fences.

There are a number of cracks in walls and floors throughout the site. Mari Paz explained that these were the normal result of settlement and would be fixed then painted. Some Juliet balconies have cracks above them. We were assured that they are perfectly safe and easily repaired.

The path by the drive in entrance to Blocks 11 and 12 ends with a drop. The fence is to be extended around the corner to avoid accidents.

We spent time in the pump rooms to each block- looking and listening. As Ken has explained, the problem with the noise should go when we are connected to the water supply from Manilva and the pressure drops. This will be checked when the change over occurs.

In various places water is seeping into garage areas. Once this has been solved the garage areas affected will be repainted.

The swimming pools are a priority and the problems  will be attended to when the technician completes his current job, which should be soon.The showers and toilets will then receive attention.

The hole full of water next to the pool shower by Block 5 is the result of a blocked underground drain which is to be rectified in the way Ken explained.This was noted to be a priority.

To prevent dirt being washed into the childrens pool by Block 5 when it rains an additional drain is to be put across the path.

A lot of broken tiles need replacing. These have been damaged by wheel barrows and so will be replaced when the other repairs  have been completed.

Juan Santos set a date for the next meeting-16th June, when we are to get together again to check on the progress which has been made. (Unfortunately I will be in England then but Ken will be there and I know he will do a sterling job for us all!)

Juan Santos seems to be 'on the ball' and keen to make sure the development is as it should be. He also wants representatives of the owners to be involved which can only be a good thing.

Dave




Like 0

Spam post or Abuse? Please let us know

18 May 2009 9:55 PM by Margo Star rating in London/Duquesa. 298 forum posts Send private message

 Dave, Ken, Thanks so much for your help whilst out there, and for taking the time to post on the forum. It really is most appreciated. Best, Margo




Like 0

Spam post or Abuse? Please let us know

22 May 2009 4:45 PM by wilton68 Star rating. 69 forum posts Send private message

I have a corner apartment top floor 3rd. Can any one please send me the size of the shower tray external for the guest shower room. Also the width of the shower room from wall to wall. My shower room has a window and i think all shower trays and rooms are slight different in size,

Also has anyone seen any signs of tarmac being layed on the road!!.

Many thanks

freddie




Like 0

Spam post or Abuse? Please let us know

Pages: 1 |
Post reply   Start new thread


Previous Threads

new road - 7 posts
Brief report from the AGM this morning-9th May 2009. - 11 posts
Latest photos - 1 posts
appartments for sale - 1 posts
Tracking Lynn & Ken - 0 posts
Agenda for community meeting for phase 1 owners - 0 posts
Should I buy ?? - 2 posts
Minutes of the meeting - 14 posts
Anybody available to meet 26 or 27 May 2009 for a glass of wine or beer - 0 posts
Useful names and numbers - 4 posts
Apartment Availability from Monday 25/5 to Thursday 28/5/09 - 0 posts
Video Shoot Thursday 10.00am - 16 posts
new photos - 0 posts
newbies here.... - 1 posts
Air Con - 3 posts
buses malage airport to sabinillas - 10 posts
WiFi - 6 posts
Penoncillo Road Petition - 15 posts
satellite guy... thomas - 3 posts
Phase 4 Deposit Returned - 0 posts
Finicci - 1 posts
Taxis from Gib - 2 posts
Confusion - 18 posts
Deposit Returned - 17 posts
ANYBODY UP FOR A POOL PARTY OVER EASTER - 16 posts

6 posts were found:


1 |
Our Weekly Email Digest
Name:
Email:


This site uses cookies. By continuing to browse you are agreeing to our use of cookies. More information here. x