Hi again, sorry a bit late with update.Had our son & grandchildren over for 4 days.
Officially visited last monday ,it was hectic.Eco meubles were unloading all the furniture for L.O.to store in a few appts.
A pantechnicon was unloading all the white goods ( fridge/freezer included)
The first cleaners arrived in 1a
In the communal area the wrought iron rails down from the top side appts were on.The lower garden area has now had top soil spread,with the path to the toilets finished with rockery edging.
Inside work continueing,boilers installed ,A/C units on walls ,arched windows (glass very thick )arrived & being put in.
Confirmed that water & electricity on solarium.
outside the roads have been worked on nonstop ,the main approach road is ready for tarmac with all the others almost there.Theconcrete bases for the pavements are laid on the left hand side of theapproach road &around the complex.,the should soon be done.The lamp posts have arrived & the first one erected.
The whole area whilst not ideal is gradually being tidied up--even the old discarded fuel tank near the water feature has gone .
Those are the facts ,this is what we,ve been told.Maria,s assistant today told us that some people will be able to sign next week.Judy is back at our rented waiting to hear from Maria to confirm this.The building foreman confirmed that whatever was going to be done on the areas between L.O. & the water feature ,it would be at least 2 years before it was started.
The weather has been mixed but everything looking sunny about L O.
Once again all the best Haydn Judy.