Update Mirador linked villas
The Site.
I visited the site and met a new foreman who told me that he was there only until December and then told me three times that he was working for Mirador but on reflection and with what PP told me I think he may in fact be working for the bank as PP say that the bank is paying the bills and also the old foreman was still there, all the labour is contract.
I was told that if they were able to keep the labour on site the first 30 could be ready by the end of November or December. They must not intend working on the rest until then.
There as not much work been done from my last visit in March but there were people working. In the centre area, by the gardens all the pathments have been finished they said that the rest around the 30 properties would be finished this week but the bottom right of the site is still as it was in March with no work at all in this area still building to do and no window frames and roads unfinished.
There are no streetlights in yet and the gas cylinder or the water heaters are not installed along with the mains water and electric, the painting inside mine requires another coat.
Garden Walls
The reason the garden walls were knocked down and replaced is because all the water, gas and electric meters have to be placed into them and they were not able to do that with the first set-up, I could not see any wooden fencing but there is wire mesh around the houses on the bottom left hand side of the site (see photo)
Package
There are no signs of the package being installed even though Miradors solicitors have said that it was installed, I was told that the air-conditioning was the hot and cold type.
Swimming Pool
This should be started by the end of the month and finished by the end of the year.
PP
My visit to PP was the usual pleasure I was sat down in the inner sanctum with 3 of PP staff looking on all sat in a row like 3 wise monkeys one of the girls was sniggering all the time and thought the conversation was very amusing, If she or her parents had invested most of there life savings into such a farce I wonder if she would have felt the same. Anyhow it was the usual waste of time with onone knowing nothing about any thing I was told (I must try to get on the site and see were it’s up to but if you find anything out let me know) this from a company who is getting megabucks for doing absolutely nothing, there are words for these people. Anyhow I didn’t expect any more from them so I was not disappointed.
Solicitor
I spent some time with my solicitor, he told me that Miradors solicitors had told him that completion was at the end of October and that the entire package was installed and all the services were connected.
There were a few points that I cannot reveal on this site as it may affect my claim but he did say that Miradors solicitors were concerned about the problems there were with the buyers and they were meeting Mirador last Friday to discuses these issues. He as told Mirador that we would not complete until the inhabitancy licence is in his hands and complete
Conclusion
I think Mirador are in financial trouble and the bank may running them if, none of use sign for the property until we get what we have paid for they have a very big problem.
I think we are winning so lets stick in and get what we have paid for
Lessons to be learnt
Never deal with these sharks as we keep them in business