... after a 3 night stay.
We're fortunate enough to have been about 6 times since the Foro was first started and we've never seen so many people working on the Foro as there were on Friday. A handful were working on it on the Saturday. However it still looks a long long way off. Tarmac was being laid in the car park, about half of it had a primary layer of the black stuff, the rest was just being flattened and levelled. It's the inside where a lot needs doing. The floor tiles in the open air bit in the middle are on their way down, but we also saw an area where they had all been ripped up again ! Apart from the glass door and window panels of each unit, the inside is totally bare with rough concrete floors and breeze block walls.
Temperatures warming up nicely, overnight minimum was 15, with a maximum of 26 on one of the days.
In a previous thread we said we'd been told by a well known keyholder that foot security patrols were starting round the gardens on May 1st. Well we can report that we saw no evidence of this !
The place is looking better and better each time we go and really feels like home now. Roll on the next visit.
Chris & Alison