John,
I've just uploaded five photos here taken 20th July.
The first two pics are the pool between blocks 12 and 10.
The third pic is the swimming pool foundations for the pool between blocks 16 and 17. You can see block 15 in the background.
Picture four shows block 15 on the right with block 16 in the foreground on the left. Block 16 is the most incomplete block.
The fifth picture shows the village as you approach on the road with block 15 at the top - from that angle it does look significantly complete but with the construction on going just above, it is difficult to see how a license could be granted for block 15 by September. Maybe you'll be in there for Christmas?
n.b. They were just taking down a tower crane near block 14 at that time (in fact I might have a photo of that happening which I'll post too).