Went over to the site this week, took some more pictures for you guys.
Unfortunately im getting a server application error when i upload to the construction photos section of this site.
So if you want to have a look at the internal, external and high level shots I have, you will have to look on my website.
I cant advertise the address, but if you dont have it already and want the link please email me and ill oblige.
Its all full steam ahead on the site now although i guess things will shutdown over Aug.
Best Regards
Rich
_______________________ Richard Clark
www.golfsanjuan.com
ww.golfsanjuan.es
Property Management
0
Like
Spam post or Abuse? Please let us know
|
Went to site today, I too have tried to uploadan ariel photo but unfortuatley to no avail, will try again later. Things are now starting to move at a fast pace, so I for am pllanningto be in for March 08! This message was last edited by KP on 7/20/2007.
0
Like
Spam post or Abuse? Please let us know
|
|
|
Thanks to Almeriastu for posting some photo's. I was at the site last November 06 and was dissapointed to see the lack of build. Great to see some progress at long last.
0
Like
Spam post or Abuse? Please let us know
|
|
|
Have uploaded some recent photos of san juan.The view is from the sun terrace of Phase 1 No 59 I think. Same house as is shown plastered.The pine tree area with picnic area .A view of phase 2&3 .Phase 3 in foreground.The other is a view from the beach. Regard Diane
0
Like
Spam post or Abuse? Please let us know
|
Hi All,
Uploaded a few photos from our recent visit:
90119: 1-a 3 bed, 2-a 3b kitchen, 3-4south/6north, 4-5south/7north, 5-7north/5south, 6-a 3b roof terr.
89831: 1-Bathroom tiling 2-Pinars 3-us 4-end of 7north,5south,5north.
Re completeion, we were also told 'in about 12 months' (for Phase V).